FRP Field Installed Inlet Hub
Overview. Site safety is paramount for a successful installation of an FRP hub to an existing wet well. Please observe all applicable state and local regulations concerning shoring of excavations, proper ingress and egress of open cut conditions, and all personnel PPE while performing this task. It is also critical to be aware of the […]
Lift Station/ Valve Vault Brochure
Portales: Project Profile
This wet well was unique in the use of WEMCO pumps with pre-rotational bases. This station utilized a set of duplex pumps for redundancy, with a third pump for an over-ride pump. Due to the size of the pre-rotational basins and the weight of the base elbows, this was an exceptionally challenging custom built wet […]
Vertical Tank Installation Manual
Fiberglass Wet Well, Limited Warranty
Main Island: Project Profile
This wet well serves as a master pump station for the entire Main Island, Ft. Walton Beach, Florida. This station houses a quada-plex (4) pump system. Each KSB pump weighed 4974 lbs., with an individual pump rating of 174 Hp. The station was engineered for a flooded condition to finish grade, with a bottom deflection […]
Hanover: Project Profile
This wetwell serves a food manufacturing facilities wash-down wastewater stream. The inlet wastestream has a pH range between 3-11 and temp at 160 F. Turnkey installation of all pumps pipe, and covers made this a quick and effortless install for this prominent Design / Build client.
Congers: Project Profile
This project was unique due to it being a custom underground horizontal tank that required three interior chambers separated by baffle walls. The purpose of these chambers was to help settle the tank and separate grease and solids. In addition, the tank was made with a VE resin to with stand tempatures of up to […]
Brookhaven: Project Profile
This was a 12′ dia. x 28′-6″ Deep Fiberglass lift station package for a residential subdivisions wastewater. This tank featured 6″ duplex discharge, FEA engineering, and over sized hatches. Overall this was a simple standard wetwell that was delivered on time and fit the exact needs of the client
Birmingham: Project Profile
This project was a rehabilitation insert for an exisiting concrete structure. It was a duplex station with 8″ stainless steel force main lines. It included an 8″ HOPE Suction line that was connected to a diesel powered emergency pump, and an oversized access hatch with a safety grate. The coordination with engineering was extensive and […]