FTS Installation Checklist

FTS Checklist 2026 - Page 1

FTS Installation Checklist for our Fiberglass Tanks The Fiberglass Tank Solutions Installation Checklist provides a clear, step-by-step reference for verifying tank condition and installation readiness. Use this quick field guide to support IMOG compliance, reduce errors, and streamline installation. Download the PDF for easy on-site access.

Pressure Testing Drawing – FTS Supplied Primary Test Manifold DW Tanks.

FTS-Supplied Primary Tank Test Manifold

Test Manifold Layout for Double-Wall Tank Pressure Testing This drawing illustrates the FTS test manifold used for field pressure testing double-wall fiberglass tanks. Reference this layout alongside the IMOG and testing procedures to ensure proper setup, safe pressurization, and accurate verification of tank integrity.

Pressure Testing Procedures – Double Wall Tanks

Field Pressure Testing Double Wall Tanks - Pg1

Field Pressure Testing (DW) Double-Wall Tanks: Procedures and Cautions Field pressure testing of DW fiberglass tanks is an important verification step to confirm tank integrity prior to installation. These procedures are provided as a supplement to the Fiberglass Tank Solutions Installation Manual and Operating Guidelines (IMOG) and apply to all FTS double-wall tank configurations. While […]

Concrete Deadman Anchoring Cut Sheets

Concrete Deadman 2025 Brochure

Recommended Installation Methods for Anti-Flotation Systems The preferred anchoring method is to set the precast concrete deadman on top of the 12″ bedding, which may affect buoyancy design.  The alternative anchoring method is to add the 12″ granular bedding over the precast concrete deadman and utilize the anchor extension.  Precast concrete deadman must be outside […]

Please choose your quote below.

1. Choose and quote form below

2. Download, Fill and Save Quote.

3. Upload quote to our Quote Upload Form.

Not ready for a Quote?

Feel free to contact us for any general questions and inquiries here!