Birmingham, AL

This project was a rehabilitation insert for an exisiting concrete structure. It was a duplex sta­tion with 8″ stainless steel force main lines. It included an 8″ HOPE Suction line that was con­nected to a diesel powered emergency pump, and an oversized access hatch with a safety grate. The coordination with engineering was extensive and tedious to meet site conditions. Overall this was a standard rehabilitation insert that was delivered on time and within budget.

Please choose your quote below.

1. Choose and quote form below

2. Download, Fill and Save Quote.

3. Upload quote to our Quote Upload Form.

Not ready for a Quote?

Feel free to contact us for any general questions and inquiries here!