This project was a rehabilitation insert for an exisiting concrete structure. It was a duplex station with 8″ stainless steel force main lines. It included an 8″ HOPE Suction line that was connected to a diesel powered emergency pump, and an oversized access hatch with a safety grate. The coordination with engineering was extensive and tedious to meet site conditions. Overall this was a standard rehabilitation insert that was delivered on time and within budget.