Katie’s Ridge: Pace, FL

This 8′ Dia. x 32′ deep wet well serves as a wastewater collection system for a subdivision. It was installed using a large diameter, auger drilling method with ground water to finish grade! This FRP wet well package came with a Florida professional engineered stamp for structural and buoyancy calculations. In conclusion, this was a unique tank install that was built to fit the exact needs of the client and was delivered on time, under budget as a prepackaged, pre-plumbed system.

Please choose your quote below.

1. Choose and quote form below

2. Download, Fill and Save Quote.

3. Upload quote to our Quote Upload Form.

Not ready for a Quote?

Feel free to contact us for any general questions and inquiries here!