Allow “Low Impact” construction methods for wet well replacement
Fully pre-packaged systems, ready for pumps
Typically sized at 8” less than inside diameter of existing concrete structure
Field installation of inlet hubs
Grouted in place
DSL for the entire life cycle of the project