Geismar Sump Tank: Harvey, LA
Beaver Lake Assoc. Plattsmouth, NE
Main Island: Fort. Walton Beach, FL
This wet well serves as a master pump station for the entire Main Island, Ft. Walton Beach, Florida. This station houses a quada-plex (4) pump system. Each KSB pump weighed 4974 lbs., with an individual pump rating of 174 Hp. The station was engineered for a flooded condition to finish grade, with a bottom deflection […]
West Sacramento, CA
Hanover, PA
This wetwell serves a food manufacturing facilities wash-down wastewater stream. The inlet wastestream has a pH range between 3-11 and temp at 160 F. Turnkey installation of all pumps pipe, and covers made this a quick and effortless install for this prominent Design / Build client.
Congers, NY
This project was unique due to it being a custom underground horizontal tank that required three interior chambers separated by baffle walls. The purpose of these chambers was to help settle the tank and separate grease and solids. In addition, the tank was made with a VE resin to with stand tempatures of up to […]
Brookhaven: Escambia County, FL
This was a 12′ dia. x 28′-6″ Deep Fiberglass lift station package for a residential subdivisions wastewater. This tank featured 6″ duplex discharge, FEA engineering, and over sized hatches. Overall this was a simple standard wetwell that was delivered on time and fit the exact needs of the client
Ceder Lake,IN
Katie’s Ridge: Pace, FL
This 8′ Dia. x 32′ deep wet well serves as a wastewater collection system for a subdivision. It was installed using a large diameter, auger drilling method with ground water to finish grade! This FRP wet well package came with a Florida professional engineered stamp for structural and buoyancy calculations. In conclusion, this was a […]