Congers: Project Profile

Municipal Wastewater Resources | Project Profiles | Wet Well and Valve Vault Resources

This project was unique due to it being a custom underground horizontal tank that re­quired three interior chambers separated by baffle walls. The purpose of these cham­bers was to help settle the tank and separate grease and solids. In addition, the tank was made with a VE resin to with stand tempatures of up to 160 degrees fahrenheit. Overall, this project was custom made to fit the exact needs of the customer, it was de­livered on time and came with an engineering stamp from a licensed professional.

© Fiberglass Tank Solutions 2024 | Web Design by MayeCreate