Overview.
Site safety is paramount for a successful installation of an FRP hub to an existing wet well. Please observe all applicable state and local regulations concerning shoring of excavations, proper ingress and egress of open cut conditions, and all personnel PPE while performing this task.
It is also critical to be aware of the weather and temperature conditions at the time of installing the FRP field hub. Area shall be kept dry, and free of loose and falling debris. In extreme cold or heat, allow for longer or shorter working times for the adhesives supplied. Moisture must be avoided for good structural bonding of the FRP hub to the wet well.